Education Recent Projects

Gifford Primary School

  • Contract Value £3.4m
  • Client London Borough of Ealing
  • Contract Period 52 Weeks
Feature image

New build construction of a part single, part two storey extension to the existing school building and ancillary works involving alterations to play areas, car parking, internal access routes and landscaping and removal of temporary buildings. The refurbishment and extension to the existing building uses materials designed to match the original structure, while the new facilities are constructed using floor to ceiling glazing.

Luton 6th Form College

  • Contract Value £230k
  • Client Luton 6th Form College
  • Contract Period 12 Weeks
Feature image

The project was carried out during the Summer recess and involved the construction of a new mezzanine/first-floor extension over the existing drama hall to create two new classrooms. Structural alterations were also made to the existing building to accommodate the new access staircase. Fast track construction was made possible through the use of Metsec steel frames and Sarnafil roofing.

Horsenden School

  • Contract Value £764k
  • Client London Borough of Ealing
  • Contract Period 22 Weeks
Horsenden

The octagonal steel-framed building was built with a timber clad external wall and slate tile roof. Sustainable elements included air source heat pumps which were used to generate energy to heat water for the underfloor heating system, kitchen and washroom facilities.